Tunga Lyft lifts a walkway in Helsingborg

14 April 2016

Järnkonstruktion AB in Helsingborg had an idea about lifting up a walkway for rebuilding. They contacted Tunga Lyft in Malmö and we decided to install our concrete blocks and 185-tonne jacks to give both a safe and stable construction as it gets quite windy in the harbour.

32 concrete blocks were then placed out and supported the walkways for two months during the rebuild. These concrete blocks are perfect as we can weld them together so they form a unit, making them very stable.

Would you like to know more?

Do you have any questions about the assignment? Contact our Product manager Martin Ericson.
Tel: +46 (0)706 33 00 59,