Tunga Lyft lifts a soda recovery boiler for Metso Power in Arauca, Chile

14 April 2016

In connection with the massive earthquake earlier in the spring of 2010, the 60 metre high and 1000 tonne soda recovery boiler had dropped about half a metre as the three metre high overhead beams had been deformed and even some parts of the peripheral equipment had been damaged. It turned out as luck would have it that the soda recovery boiler survived without serious damage.

A procurement was negotiated where Tunga Lyft was commissioned to lift the boiler into place. As a lot of the infrastructure in the area had been destroyed, it was not easy to get around, to assess the conditions and arrive at the best solution to the problem.