Tunga Lyft installs a half tonne star on the Liseberg tower

2 May 2016

In recent years Tunga Lyft has had the honour to spread Christmas cheer over Gothenburg. The star was transported into the air with the help of a helicopter, and the weather conditions needed to be perfect. Waiting at the top of the 125 metre high Liseberg tower was one of our top fitters ready to anchor the 500 kg heavy and 6 metre in diameter star.

See the video clip of the star lift on Expressen.

Would you like to know more?

Do you have any questions about the assignment? Contact our Product manager Martin Ericson.
Tel: +46 (0)706 33 00 59,