Bridge demolition in Umeå

15 June 2016

A disused railway bridge outside of Umeå needed to be demolished. Tunga Lyft was awarded the contract and chose to draw the bridge onto land for the demolition - something that the client performed on site.

We used wire jacks and Teflon with a special nose in order to succeed. Luckily there were no bears, just annoying mosquitoes that liked all of us...