Full speed ahead at ESS in Lund with the pile driving work

13 July 2016

Tunga Lyft is keeping pace up even during holidays. We are testing the ground’s structure at ESS in Lund It is important that nothing goes wrong before the building is erected, which why we are loading the piles with up to 940 tonnes.